[1] Young Journalist Club, (2013). Wood cultivation in West Azerbaijan in search of processing units, Newbies are out of breath,
http://www.yjc.ir/00J7sK
[2] Balassa, B., (1965). Trade liberalization and revealed comparative advantage, The Manchester School of Economic and Social, vol.33, pp. 99-123
[3] Azizi, M., Dehghan Karuki, R., Rukhuddin Eftekhari, A., Faizipour, M., (2013). Determining investment
[4] Priorities of wood and paper industries in Qom province using TOPSIS method, Forest and Wood Products Journal, 66(1):109-124. (In Persian)
[5] Jahangiri, A. Nasiri, M. (2007). Investigation and determination of country's industrial investment priorities using taxonomy technique, Journal of Humanities and Social Sciences, 7(25) (specialized in management). (In Persian)
[6] Akbari, N. Moradi, Z., (2008). Economic survey and determination of industrial investment priorities in Kurdistan province, Journal of Humanities and Social Sciences, 3, 8, serial 30- special economic sciences. (In Persian)
[7] Khanegi, A. Rafiqi, A. and Hosseinzadeh, A., (2016). Identification and prioritization of indicators effective in determining the investment priorities of the wood and paper industries of Kurdistan Province, National Conference on Entrepreneurship and Investment Opportunities in Makran Coast of Iran, Chabahar, https://civilica .com/doc/604860. (In Persian)
[8] Osmani, N., and Samei, Q., (2016). Determining the industrial investment priorities of West Azarbaijan Province using the Analytical Hierarchy (AHP) method. Regional Economy and Development.;14(24):148-73. (In Persian)
[9] Maness, T.C., and Norton, S.E., (2002). Multiple periods combined optimization approach to forest production planning. Scand. J. For. Res., 17, 460–471.
[10] Maturana, S., Pizani, E., and Vera, J.R., (2010). Scheduling Production for a Sawmill: A comparison of a mathematical model versus a heuristic. Comput. Ind. Eng, 59, 667–674.
[11] Jerbi, W., Gaudreault, J., D’Amours, S., Nourelfath, M., Lemieux, S., Marier, P., and Bouchard, M., (2012). Optimization/simulation-based framework for the evaluation of supply chain management policies in the forest product industry. In Proceedings of the 2012 IEEE International Conference on Systems, Man, and Cybernetics (SMC), Seoul, Korea, 14–17. 1742–1748.
[12] Ben Ali, M., Gaudreault, J., D’Amours, S., and Carle, M.A. A., (2014). Multi-Level framework for demand fulfillment in a make-to-stock environment-A Case Study in the Canadian Softwood Lumber Industry, MOSIM, 10ème Conférence Francophone de Modélisation, Optimisation et Simulation. Available online:
https://hal.archives-ouvertes.fr/hal-01166600 (accessed on 25 November 2020).
[13] Bajgiran, O.S., Zanjani, M.K., and Nourelfath, M., (2016). The Value of integrated tactical planning optimization in the lumber supply chain. Int. J. Prod. Econ., 171, 22–33.
[14] Huka, M.A., and Gronalt, M., (2017). Model development and comparison of different heuristics for production planning in large-volume softwood sawmills. Eng. Optim., 49, 1829–1847.
[15] Vanzetti, N., Broz, D., Corsano, G., and Montagna, J.M., (2018). An optimization approach for multiperiod production planning in a sawmill. For. Policy Econ. 97, 1–8.
[16] Broz, D., Vanzetti, N., Corsano, G., and Montagna, J.M., (2019). Goal programming application for decision support in the daily production planning of sawmills. For. Policy Econ., 102, 29–40.
[17] Kühle, S., Teischinger, A., and Gronalt, M., (2019). Form-based postponement in the solid hardwood supply network. CogentBus. Manag, 6(1). https://doi.org/10.1080/23311975.2019.1701887
[18] Vanzetti, N., Broz, D., Corsano, G., and Montagna, J.M., (2019). A detailed mathematical programming model for the optimal daily planning of sawmills. Can. J. For. Res., 49, 1400–1411.
[19] Abasian, F., Rönnqvist, M., Marier, P., and Fjeld, D., (2020). The transportation game. INFORMS Trans. Educ., 21(1): 1-12.
[20] Memarini, A. and Azar, A., (1995). AHP: A New Technique for Group Decision Making. Management Science. NO. 28, 11 pp. (In Persian)
[21] Saaty T. L., (2000). Decision Making for Leaders, RWS Publications, Pittsburgh, PA, 323pp.
[22] Ghorbannezhad, P., Azizi M., Ray C., Yoo C. and Ramazani O., (2013). Application of sensitivity analysis for assessment of energy and environmental alternatives in the manufacture by using AHP, Environment Protection Engineering, 39(3):5-20.